Mon
Apr 28 2025
07:38 am

A new 1.4-megawatt solar installation has been completed at the McGhee Tyson Air National Guard Base in Louisville/Alcoa.
...
The solar system, designed to enhance the base’s energy resilience and offset energy costs, is part of a phased initiative to establish a microgrid at the base. The base will eventually add battery storage to the installation, further reducing the base’s grid reliance.

Is it good this project was finished before the president canceled funding?

Topics:

TN Progressive

TN Politics

Knox TN Today

Local TV News

News Sentinel

    State News

    Wire Reports

    Lost Medicaid Funding

    To date, the failure to expand Medicaid/TennCare has cost the State of Tennessee ? in lost federal funding. (Source)

    Search and Archives